I'm still working on the water system at Last Hurrah. The pond has to be filled, water pumped into the settling tank, then 3,000 gallons pumped into the two holding tanks after going through the commercial filters, sand filter, and the house filters. There are lights coming on everywhere when there's too little water in a specific tank, when there's too much water in a specific tank, and overflows from one tank to another. It takes 45 minutes to fill the settling tank and 30 minutes to drain it all the while watching for warning lights to come on. On Friday Jax and I spent some time at Last Hurrah filling the pond and beginning to work on the number of pumps and hoses that will run the right amounts to keep any lights from coming on so I'm not just sitting in the water room watching for warnings.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment